
Indoor Air Quality (IAQ) – One-Page Implementation Checklist
A practical IAQ checklist for owners, engineers, consultants, and facility managers
Strategy & Objectives
-
Define IAQ objectives (health, compliance, ESG, productivity)
-
Identify applicable standards (ASHRAE, WELL, LEED, local codes)
-
Align IAQ strategy with Net Zero / Vision 2030 / ESG goals
-
Establish performance-based targets (not just prescriptive ventilation)
Building & Occupancy Assessment
-
Building type (healthcare, hospitality, office, education, mixed-use) Occupancy density and peak usage patterns
-
Climate factors (heat, humidity, dust, pollution levels)
-
Existing HVAC system type and capacity
-
Known IAQ risks (PM, VOCs, pathogens, odours)
Technology Selection
-
Select active vs passive purification approach
-
Confirm technology effectiveness across:
-
Particulates (PM2.5 / PM10)
-
VOCs
-
Microbial contaminants
-
Odours
-
Verify third-party testing and validation
-
Ensure ozone compliance and safety thresholds
-
Confirm compatibility with existing HVAC systems
System Design & Engineering
-
Integrate IAQ into HVAC design (not as a bolt-on)
-
Confirm correct equipment sizing and placement
-
Ensure coverage of occupied breathing zones
-
Validate ion / treatment levels against design targets
-
Coordinate with ventilation and filtration strategy
Measurement & Monitoring
Install real-time IAQ sensors (minimum):
-
CO₂
-
Temperature
-
Relative Humidity
-
PM2.5
-
TVOCs
Define alert thresholds and performance benchmarks
Enable trend logging and historical data storage
Ensure data supports compliance and ESG reporting
BMS & Controls Integration
-
Integrate IAQ systems with Building Management System (BMS)
-
Enable automatic output modulation based on conditions
-
Coordinate with ventilation and energy optimisation strategies
-
Provide centralised dashboard visibility
Commissioning & Validation
-
Verify installation against design intent
-
Validate IAQ performance post-installation
-
Establish baseline IAQ data
-
Document commissioning results
Operations & Maintenance
-
Define inspection and service intervals
-
Confirm consumables and replacement schedules
-
Train facilities teams on system operation
-
Establish revalidation and performance review process
Reporting & Continuous Improvement
-
Produce IAQ performance reports
-
Align reporting with ESG, WELL, and LEED requirements
-
Review data to optimise energy and performance
-
Update strategy as building use evolves
